NHS Nightingale Hospital, London – New step down facility
LBC are proud to be providing Building Control advice for the remodelling works at the Excel Nightingale Hospital to form a step-down facility for the NHS.
The facility, for patients who have had Covid19 and are recovering / needing rehabilitation before they go home, will deliver 64 beds in the South Hall of the Excel, with further phases delivered through January providing a total of 250 beds for use by the NHS.
What our clients say
“Made the whole process stress free and added value to our finished product. The whole process was made so much easier by the inspector being so helpful, nothing was ever too much trouble. Professional but with the ‘human touch’.
“LBC have taken our eco-build (timber frame, straw infill, steeply sloping site), easily in their stride; we have been impressed by their pertinent questions and immensely helpful ‘can do’ attitude.
I wanted to leave a review for the CPD that Michael gave us on the Building Safety Act. It was an excellent CPD very informative, thorough and engaging.
“Very satisfied – gives ideas and saves customers costs; very helpful, competent, keen to advise and a prompt service”
“Good attention to detail and a very direct and accessible service.”
“You’re doing a good job – First Class, a very personal service”
“Thank you for your kindness in helping to resolve problems on our project”